The industry stove builds the project by laying bricks or stones and constructs and confirms and standardizes GBJ 211-87
Chapter 3 ¡¡Not setting fire-proof material
¡¡Section 1¡¡General provision
¡¡¡¡3.1.1, carry the not certain form fire-proof material of go to the workplace, should have the standard of the current nation ¡¶ uncertain the form fire-proof material( fine and separate hot) classification ¡· complete card number rule.
¡¡¡¡3.1.2, carry the not certain form fire-proof material of go to the workplace, in addition to should meet the provision of this norm Article 2.1.1s outside, should still have the construction method manual that factory of production establish.
¡¡¡¡3.1.3, uncertain the form fire-proof material if pack the damaged material to leak, be subjected to pollute obviously or damp change in character, should wrap shouldn't use.
¡¡¡¡3.1.4, carry the workplace fire-proof to prepare to make the piece of ¹¹ superficial and should have:
¡¡¡¡one, produce the unit to print to record;
¡¡¡¡Two, the quantity examination is qualified to print to record;
¡¡¡¡Three, in the dissimilarity of three face up have in accordance with the construction the diagram mutually of parts serial number;
¡¡¡¡Four, hang some marking.
¡¡¡¡¡¡¡¡Fire-proof prepare the size accuracy of make the piece , should press current nation standard ¡¶ glue the soil quality and high aluminum qualities fire-proof sprinkle to note to anticipate ¡· carry on the examination.
¡¡¡¡3.1.5£¬ put fire-proof prepare to make the piece , pay the position and methods for accepts, should match the piece of Mattress to be subjected to the dint circumstance, shouldn't make prepare to make the piece to produce super should dint and harm.
¡¡¡¡3.1.6, at under construction can not change arbitrarily uncertain the match of the form fire-proof material compare.Shouldn't add water or other materialses arbitrarily in mix blend the good not certain form fire-proof material.
¡¡¡¡3.1.7, and uncertain the form fire-proof material contiguous steel structure and the surface of the equipmentses, should first in addition to become rusty.
¡¡¡¡3.1.8, brick with solid anchor man or mourn the shape and sizes of hang the bricks and should pursue a piece of check and check before acceptance.Solid brick of anchor man or mourn to hang the brick and can not have the horizontal crack.
¡¡¡¡3.1.9, brick with solid anchor man or mourn the position of hang the brick, at the request of match the design, and keep with a hull or mourn to hang the beam mutually perpendicular.
¡¡¡¡¡¡¡¡The solid hook of the anchor man solid brick, anchor man solid and anchor mans must tense each other, but solid brick of anchor man should the ability rise and fall with a wall bulge ¡¡¡¡¡¡
The solid hook of anchor man is on all sides can not filler.
¡¡¡¡¡¡¡¡Mourn to hang the brick with mourn of hang the beam should the Mattress is tight.Before dry stove, must tore down the mat of Mattress .
Before sprinkle to note, spray to draw the construction, solid brick of anchor man or mourned to hang the brick in advance smooth wet.
¡¡¡¡¡¡¡¡Solid tool of the metals of etc.
¡¡¡¡3.1.10, vibration stick, the hammer, can not directly function in solid brick of anchor man or mourn to hang the brick up.When it's necessary, should mat with wooden board.
¡¡¡¡3.1.11, heat the cold tube of water in the stove before exterior tie up the heat preservation layer, must check whether the anchor man firmware( nail the hook, the steel wire an etc.) is fixedly firm and reliable or not, then paid the mold to sprinkle to note or the beat.
¡¡¡¡¡¡¡¡If use to prepare to make the piece to tie up the cold tube of water, prepare to make the piece and pipe lines and must stick tightly, prepare the indirectly of make the piece and sew the mud and must be full, this is solid.
¡¡¡¡3.1.12, uncertain the form fire-proof material inner pad allows the size error margin, can according to the request assurance toward the fire-brick inner pad.
¡¡Section 2¡¡¡¡ Is fire-proof to sprinkle to note to anticipate
¡¡¡¡3.2.1, mix blend fire-proof the water that sprinkle to note to anticipate to use, should adopt the clean water.The foreland mixs blend the water, should through analyze, its chlorine ion() content is shouldn't be big in 300 ppms.
¡¡¡¡3.2.2, the template that sprinkle to note to use should have enough of just degree and strength, pay the mold size and should be accurate, and prevent¡ãfrom transforming in start construction process.
¡¡¡¡¡¡¡¡The template joint should be tight, gastight syrup.Should adopt to defend to glue the measure to the template.
¡¡¡¡¡¡¡¡With sprinkle to note to anticipate contiguously surface of separate the hot body of Æö , should adopt the waterproof measure.
¡¡¡¡3.2.3, sprinkle to note to anticipate proper use the compulsive type mixer agitation.While changing to use to anticipate the card number, mixer and anticipate the ¶· , measure the container...etc. and all should be pure to clean up.
¡¡¡¡3.2.4, mix blend to glue the soil goodly fire-proof sprinkle to note to anticipate, the high aluminum cement is fire-proof to sprinkle to note to anticipate, the glass of water is fire-proof to sprinkle to note to anticipate and have already added the phosphoric acid salt of the of fire-proof sprinkle to note to anticipate, should sprinkle to note to finish in the 30 mins.
¡¡¡¡¡¡¡¡The already early sprinkles to note to anticipate and can not use.
¡¡¡¡3.2.5, sprinkle to note to anticipate the medium reinforcing bar or metalses to lay the piece, should establish at be subjected to the hot side not.
¡¡¡¡¡¡¡¡Note:The common reinforcing bar use temperature shouldn't over 350 ¡æs.
¡¡¡¡3.2.6, whole sprinkle the constitution that note fire-proof inner pad inflation's sew, should be rule by the design.For glue the soil quality or high aluminum quality fire-proof to sprinkle to note to anticipate, be the design and sew the number and did not rule to the inflation, each inner pad that rice grow the average number that inflation sew, can adopt the following data:
¡¡¡¡¡¡¡¡one, glue the soil fire-proof sprinkle to note to anticipate for the 4-6 mms;
¡¡¡¡¡¡¡¡Two, the high aluminum cement is fire-proof to sprinkle to note to anticipate for the 6-8 mms;
¡¡¡¡¡¡¡¡There, the phosphoric acid salt is fire-proof to sprinkle to note to anticipate for the 6-8 mms;
¡¡¡¡¡¡¡¡Four, the glass of water is fire-proof to sprinkle to note to anticipate for the 4-6 mms;
¡¡¡¡¡¡¡¡Five, the sic mire of sour brine is fire-proof to sprinkle to note to anticipate for the 5-8 mms.
¡¡¡¡3.2.7, sprinkle to note to anticipate and should flap the solid.Flap the machine tool of proper adoption insert type flaps the machine or the flat panel vibration machines.Can adopt the adhere to type vibration machine or the artificial under the condition of special solid.
¡¡¡¡¡¡¡¡When flap the machine with the insert type, sprinkle to note the layer thickness and shouldn't exceed to flap the function parts of lengths of the machine of 1.2500%;When use the flat panel vibration machine, its thickness shouldn't over 200 mms.
¡¡¡¡¡¡¡¡Note:Separate hot fire-proof sprinkle to note to anticipate the proper adoption artificial solid.When the adoption machine flaps , should prevent¡ãfrom leave Îö and the physical volume density aggrandizement.
¡¡¡¡3.2.8, fire-proof sprinkle to note to anticipate of sprinkle to note, should continue to carry on.Fore the layer sprinkles to note to anticipate before condense, should sprinkle a layer to note to anticipate to sprinkle to note to complete.Intermittent exceed the coagulation time, carry on the processing at the request of press construction sew.The construction sew proper stay on-line in same center of brick with solid row anchor man.
¡¡¡¡3.2.9, sprinkle to note to anticipate of protect, should press the card number provision use of method carry on.Sprinkle to note to anticipate to protect the period, can not be subjected to the outside dint and vibrations.
¡¡¡¡3.2.10, not accept the heavy template, should at sprinkle to note to anticipate the strength and can guarantee that its surface and sharp angles are not damaged bad or transform because of dismantle the mold, just can tore down;Accept the heavy template should just can tore down after sprinkling to note to anticipate to attain to design 70% of strength.
The hot rigidity sprinkles to note to anticipate and would not¡ã bake after specifying the temperature, be able to dismantle the mold.
¡¡¡¡3.2.11, sprinkle to note to anticipate on the scene to sprinkle to note the quantity, should compare with each card number or matches of the single-item engineering, each 20 try the piece to carry on the examination for a batch of detentions.Shortage this the number also makes an examination;Try examination every a single-item engineering adopt same card number or matches compare many constructions, each time start construction all should detain.
¡¡¡¡¡¡¡¡Examine the item and the technique requests, can press current nation the standard ¡¶ glue the soil quality and high aluminum qualities fire-proof sprinkle to note to anticipate ¡· of provision performance.
¡¡¡¡3.2.12, sprinkle to note to anticipate the surface and shouldn't is peeling off, crack, hole etc. blemish.Note:Can allow to have the slight net crack.
¡¡¡¡3.2.13, glue the soil to sprinkle to note to anticipate, the glass of water sprinkles to note to anticipate and the phosphoric acid salt sprinkle to note to anticipate of prepare and make piece, not proper put in the open-air heap.When the open-air heap put, should adopt to defend the rain measure.
¡¡¡¡3.2.14, rise to hang to sprinkle to note to anticipate to prepare to make the piece, prepare the strength that the strength of make the piece is at the request of attain the design to mourn to pack.
¡¡¡¡¡¡¡¡When the arch crest that rises to mourn the unqualified prepare to make the piece, should adopt to reinforce the measure at the time.
¡¡¡¡¡¡¡¡The width of the body blind side, should be rule by the design.The sews or reserves to infuse to strach the bore, application with the fire-proof mud that its composition adapt mutually or sprinkle to note to anticipate to fill full, it is should hang up to sew by hot noodles.
|