Sprinkle to note general principle of anticipate the construction
1. Sprinkle to note to anticipate the construction, the front should carry on strictly as follows the check of the contents:
1.1, checks treat to sprinkle the shape of note the equipments and sweep the circumstance;
1.2, checks start construction the intact circumstance of the machine tool, flap the 捣 tool, etc. must have the intact back up piece;
1.3, check anchor man firmware pattern, size, arrange and weld the quantity, the metals anchor man firmware must work well the inflation to compensate the processing;
1.4, check surroundings fire-brick 衬s and separate the prevention of the hot layer to sprinkle to note to anticipate to lose the measure of water;
1.5, the packing and a date of factories that check to sprinkle to note to anticipate, and carry on prepare the experiment check whether expiration;
1.6, check the construction use water, its fluid matter must attain the quantity of the drinking water.
Any above-mentioned item check the unqualified hour should handle the qualified rear and can start construction.The material of the overdue expiration can not use.Sprinkle to note to anticipate under construction to insure and don't have a power fail, don't break off the construction.
2. Sprinkling to note to anticipate the construction to use template can make into with the steel plate or the hardwood planks.The template wants the enough strength, rigid good, don't walk form, don't move, gastight syrup.The steel template wants to draw to take off the mold, the wood template wants to brush the waterproof paint.The template that repeats the usage wants to clean first, then draw to paint the square and can use.
3. Sprinkle to note to anticipate of add amount of water should strict press usage manual to control, can not exceed the capacity.While guarantee the premise of the construction function, add the amount of water proper and little much notter proper.
4. Sprinkling to note to anticipate to mix blend time should be no less than 5 minutes.Operate to use the compulsive type mixer.Mix blend proper do to mix in advance, then join the water that 80% uses the water quantity to mix blend, then see its dry wet degree, join the water of the surplus to continue to mix blend slowly, until acquire featly work dense degree.Mix blend to sprinkle to note to anticipate differently should clean mixer is pure first.
5. Sprinkle to note to anticipate must an usage of the whole whole bag.Mix blend to sprinkle to note to anticipate goodly to use up within 30 minutes generally.At still want to shorten this just the right amount in the homework of dry heat environment at that time.The already early even sprinkles to note to anticipate cakingly and can not pour into in the mold frame, also can not add the agitation of water to use again.
6. Pour into the mold frame of sprinkle to note to anticipate and should use to vibrate the good layering to shake immediately actually, the each story high degree should be not big in 300 mms, vibrate be apart from with the 250 mms is or so is proper.Vibrate as far as possible avoid touch the anchor man firmware, can not on same position long earthquake and heavy earthquake.Seeing sprinkle note anticipate the surface should vibrate the good slowness to draw out after return the syrup, avoiding sprinkle to note to anticipate the layer creation to leave the phenomenon and appear empty.
7. When big area sprinkle to note, to divide a piece of construction.Each one sprinkles to note the area area with the 1.5 m2s is or so is proper.The inflation sews to want to stay to establish according to the design, can not leave out.The inflation sew should stay to establish in the anchor man firmware partition of position.
8. After treating to sprinkle to note to anticipate the surface aridity, should use the plastics thin film or the grass bags to cover up in the air part of immediately strict.The early wants to periodically sprinkle water to protect after arrive, keeping its surface wetness.Protect time for two days at least, the first day inside want to sprinkle water frequently.Sprinkle to note to anticipate eventually the can tore down the side mold to continue to sprinkle water to protect behind, but accept the heavy template the beard needs the strength to attain 70%, the square can dismantle the mold hereafter.
9. The template should note the body to carry on the check towards sprinkle in time after tore down.Discover the beehive, peeling off and empty etc. quantity problem wants to handle in time with the repair.Problem the serious hour want to is solid to anticipate to fill with the with the of the quantity the blemish part digs to go to, peep out the anchor man firmware, then use actually, continuing to protect, forbiding to touch even to cover up the problem with the cement ash syrup.
|